A Place for my Quilts, Family and Friends
Showing posts with label Robin Egg Blue Roses. Show all posts
Showing posts with label Robin Egg Blue Roses. Show all posts
Friday, March 25, 2011
Still here...
I can't help it! The babies and the Dr's aren't cooperating much...Two babies quilts are READY except for the binding. I have quilted 5 baby-sized quilts, three of the quilts are ones that needed to be done anyway. My February MONOCHROMATIC Challenge Quilt, the Sweet 16, and a Surprise gift for somebody. It's been a very busy week at Thread and Bolts! Lynn quilted three charity baby quilts all at the same time and a Super-sized twin quilt for a family that was burned out last fall. Lynn does a lot of Charity Quilts! You can see more at the Link above. There is a slideshow of Charity Quilts that she has done. The Computer makes the quilting go fairly fast when making small quilts. We completed a total of 9 Quilted and there are two more ready to go. It's nice to leave the longarm quilting machine full with a quilt for Lynn to do over the week-end while I'm not there.
1st is a sneak peek of Brant and Tina's Bambino's quilt. I found the perfect backing for it, I think! It was truly a "Quilt in a DAY". I cut it out, assembled and quilted it all on Wednesday.
This one is a surprise so I'm only showing part of it.
I quilted the surprise one and the Violet Monochromatic Challenge from February together. It was not easy to use two different backings...note to self! I like the Wild Roses I quilted on them .

The week of hard labor will show in my Stash report on Sunday!
My two girls have a different kind of LABOR to go through. There is a great PRIZE at the end, I tell them. My Mother-in-law around the time I was due would tell me it was her turn to hold the baby, I'd been holding him/her long enough...
Monday, February 7, 2011
Design Wall Monday February 7, 2011
This week I have 3 "flimsies" on the walls. I'm auditioning backing for the Yellow challenge quilt. I know it doesn't have just Yellow in it, but it is the right yellow to be backing, I think.
And these two quilts are works in progress that I can't show the whole thing for a while. They will be quilted sometime before April... for a grandbaby and Maybe my Sister so no peeking!
The flower underneath on the wall is halfway appliqued on for the "Alliance" Challenge
that I blogged about HERE. The deadline for having the quilt done in time to mail so it can be at Paducah is coming up fast. I've made a list of all my deadlines and I'm checking it twice just like Santa Claus...
Go to Judy L's Blog to see other Design Walls HERE.
Subscribe to:
Posts (Atom)
Blog Archive
Blog of the week!
Second time winner